Cut-and-cover tunnel
High Speed Rail (Crewe – Manchester) Environmental Statement, Glossary, abbreviations and references, published by the Department for Transport in 2022, defines a cut-and-cover tunnel as: ‘A tunnel constructed by excavating a cutting constructing a box-type structure and reinstating the ground over the top to its original level. Cut-and-cover tunnels can be constructed in two ways:
• ‘bottom up’ where an excavation is created from the surface, before the tunnel floor, walls and roof are then built and the entire structure buried and the surface restored; and
• ‘top down’ where the tunnel walls are inserted into the ground and the roof added, before the material within the tunnel is excavated from either end.’
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.