Cut-and-cover tunnel
High Speed Rail (Crewe – Manchester) Environmental Statement, Glossary, abbreviations and references, published by the Department for Transport in 2022, defines a cut-and-cover tunnel as: ‘A tunnel constructed by excavating a cutting constructing a box-type structure and reinstating the ground over the top to its original level. Cut-and-cover tunnels can be constructed in two ways:
• ‘bottom up’ where an excavation is created from the surface, before the tunnel floor, walls and roof are then built and the entire structure buried and the surface restored; and
• ‘top down’ where the tunnel walls are inserted into the ground and the roof added, before the material within the tunnel is excavated from either end.’
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.